Storm Water Updates

The Stormwater Focus Group Meeting was held on June 29th

 

Brightmoor Parcel Holds 

Brightmoor Parcel Holds

 

PDD and DWSD Collaboration

DWSD and PDD are working to integrate DWSD’s stormwater management plan for uncontrolled CSO’s on the Rouge River within PDD’s neighborhood framework plan.

PDD and DWSD Collaboration
PDD roles and responsibilities:

• Works with the community and DWSD to finalize the final look and feel of the DWSD infrastructure/stormwater management installation

• Works with the community to determine what surrounds the DWSD infrastructure

• Works with the community to determine if additional stormwater features could feed into the DWSD infrastructure (to be designed/installed/maintained by others)

DWSD roles and responsibilities:

• Responsible for locating, designing, constructing, and maintaining large-scale affordable stormwater management for regulatory compliance.

• Coordinating with PDD consultants to ensure the vision for the neighborhood is unified.

 

Schedule for Evaluating Large-Scale GSI in Brightmoor

Schedule for Evaluating Large-Scale GSI in Brightmoor