Final Floodplain Notice - Brightmoor Outfall
Final Notice and Public Explanation of a Proposed Activity in a Floodplain
To: All interested Agencies, Groups and Individuals
This is to give notice that the City of Detroit under 24 CFR Part 58 has conducted an evaluation as required by Executive Order 11988, as amended by Executive Order 11990, and in accordance with HUD regulations at 24 CFR 55.20 in Subpart C Procedures for Making Determinations on Floodplain Management and Wetlands Protection. The activity is funded under Community Development Block Grant Disaster Recovery (CDBG-DR) funding, authorized by Disaster Relief Supplemental Appropriations Act, 2022 Public Law 117-43.
The proposed project(s) is located along the Rouge River within Eliza Howell Park, west of Lyndon Street in the City of Detroit. The project location spans from the intersection with Greydale Street, extending to Beaverland Street, and past the end of Lyndon Street to meet the east bank of the Rogue River in the Brightmoor Neighborhood of Detroit, Michigan. This project location is partially located in the floodplain. The extent of the Federal Flood Risk Management Standard floodplain was determined using the Freeboard Value Approach.
This project is one phase of a larger stormwater improvement project located in the Brightmoor neighborhood. The purpose of this project is to improve the quality of the Rouge River by introducing storm-only flows and reducing the volume of combined sewage that outlets during large rain events. The proposed outfall involves installation of 6,600 linear feet of sewer, 6,600 linear feet of pavement replacement, and new construction of a 54-inch designated stormwater outlet into the Rouge River to reduce the occurrence of sewage discharging from the existing combined sewer outlet. The project’s site area of impact upstream includes the installation of an 18-acre detention pond, designed to collect and manage stormwater from a 233-acre catchment area, which will flow to the new stormwater outfall. The site is located partially within the A Zone (special flood hazard area) as indicated on the Federal Emergency Management Agency Preliminary Flood Insurance Rate Map Panel 69 of 575 Map Number 26163C0069E, revised February 2nd, 2012. The proposed site area of impact below the Ordinary High-Water Mark includes 45 linear feet of stream and 143 cubic yards for the pre-cast wing wall of the outfall. There will be a temporary impact below the 100-year floodplain of 77 cubic yards during construction, which will be restored.
The City of Detroit has considered the following alternatives and mitigation measures to minimize adverse impacts and to restore and preserve natural and beneficial functions and intrinsic values of the existing floodplain/wetland: The first alternative was to construct the tunnel in a different location, which would involve the construction of a tunnel. This alternative involved running the proposed storm sewer south, along Outer Drive, to the Rouge River. This alternative would require the construction of an approximately 400-foot-long tunnel under the I-96 freeway and additional piping as the distance to the outfall would increase. Construction of this tunnel would have a negative impact on residents in the area and would add significant costs to the project. The second alternative was locating the outfall immediately adjacent to the existing combined sewer outfall at Lyndon. This alternative would require the construction of an outfall discharging from the pre-existing combined sewer system and would not provide separation of stormwater and sewage discharge between the two systems. Therefore, this method would not achieve complete removal of stormwater where feasible from the combined sewer, nor adequate positive impact to alleviate the flow in the upstream combined sewer system during peak storm events. Shifting the outfall further downstream to the initial proposed location provides improved separation, positive impacts to upstream flow, and allows for preservation of the large landmark trees. Of the alternatives analyzed, the team will move forward with the planned design. Stormwater outfalls need to be in or near a floodplain because they must discharge water directly into a receiving waterbody like a river, stream, lake, or wetland, which naturally sit at the lowest point of the landscape. The current site is located at the lowest point of elevation and was determined to have the lowest impact to people, property, and the environment.
The following site plan modifications were selected to mitigate floodplain impacts: 1. All state and local floodplain protection procedures will be adhered to. The Part 31 Permit number WRP049893 v.1, approved by EGLE, specifically Part 301 Permit for Inland Lakes and Streams, will be followed to mitigate any impacts from outfall construction. 2. Sedimentation barriers will be installed to handle sedimentation throughout the site. Silt fence will be placed to ensure that no sediment enters the Rouge River during the construction process. 3. Water quality controls will be in place before final outlet location. The proposed design will meet EGLE and DWSD water quality standards. 4. Any disturbed native vegetation will be replaced and restored through reseeding and replanting. Additional native plantings, such as wildflowers and fescues, will provide new habitats for the river ecosystem. 5. Temporary stabilization measures will be installed to prevent erosion into waterways/wetlands. No fill or material will be placed in any wetland. 6. The fugitive dust plan and hazardous materials plan will be followed during construction. Pollution to the floodplain will be mitigated through keeping construction equipment in proper working order. By mitigating impacts, the proposed action will preserve the natural and beneficial values served by the floodplains.
The City of Detroit has reevaluated alternatives to building in the floodplain and has determined that it has no practicable alternative to floodplain development. Environmental files documenting compliance with Executive Order 11988, as amended by Executive Order 11990, and 24 CFR 55.20 are available for public inspection, review and copying upon request at the times and location delineated in the last paragraph of this notice for receipt of comments.
There are three primary purposes for this notice. First, people who may be affected by proposed activities in the floodplain and those who have an interest in the protection of the natural environment should be given an opportunity to express their concerns and provide information about these areas. Second, an adequate public notice program can be an important public educational tool. The dissemination of information and request for public comment about the floodplain can facilitate and enhance Federal efforts to reduce the risks and impacts associated with the occupancy and modification of these special areas. Third, as a matter of fairness, when the Federal government determines it will participate in actions taking place in the floodplain, it must inform those who may be put at greater or continued risk.
Written comments must be received by the City of Detroit at the following address on or before November 30, 2026
City of Detroit Office of Development and Grants
2 Woodward Avenue, Suite 908
Detroit, MI 48226
Attention: Penny Dwoinen, Environmental Review Officer
A full description of the project may also be reviewed on the City of Detroit’s Office of Development and Grant’s Public Notice page https://detroitmi.gov/departments/office-chief-financial-officer/ocfo-divisions/office-development-and-grants/hud-programming-and-information/public-notices. Comments may also be submitted via email at [email protected].
November 20, 2026