Fugitive Dust Ordinance

On This Page

News & Events

Related Links

Videos

Documents

Forms

FAQs

District Map

Office Directory

Contacts

Contacts

FAQs

Sections

Web Apps

News

Events

FAQs

Statements

Newsletters

FAQs

Resolutions

Memos

Fugitive Dust Ordinance 

 

Who is regulated: All businesses, non-profits organizations, churches, and other such institutions and residential structures containing five or more household units.  Does not include single- and two-family dwellings. A Fugitive Dust (FD) plan is required for all new construction.  Possible dust generating operations include: 

  • Weed abatement
  • Freight and trucking
  • Construction and demolition sites
  • Outdoor Storage (greater than 5 acres)
  • Manufacturing and processing facilities 

What is required: Owner/operator must submit a FD plan detailing how not to generate an opacity greater > 5% onsite or greater than > 0% offsite.  Revise/update that plan when operations change or as requested by BSEED.

How it works: 

  • A FD plan may be required as part of the commercial annual inspection; businesses receive every two years.
  • A FD plan is required for any permit for dust generating activities.
  • After a permit is issued, inspectors may require a FD plan if dust is being generated.

BSEED has authority/responsibility to monitor and inspect to ensure compliance.

What’s in a Fugitive Dust Plan: 

  • Name and address of the community establishment
  • Community establishment designee
  • Owner of the property contact information
  • Person responsible for implementing the plan contact information
  • Dates and periods of time during which dust is expected to be generated

Site map drawn to scales depicting the following:

  • Community establishment boundaries
  • All buildings, internal roadways, and utilities
  • All roadways and transportation corridors within ¼ mile of the perimeter
  • All potential emission points
  • A detailed description of operations which are expected to generate dust
  • Dust control measures, and their maintenance.
  • The training provided to staff regarding dust control measures

A monitoring plan includes the following:

  • The schedule and plan for testing
  • The contingency plan when the fugitive dust exceeds action levels. The response activities should consist of a range of increasingly aggressive measures
  • A fact sheet or executive summary of the FD plan designed to inform the public
  • High wind events (>20 mph): dust generating activities must be suspended unless alternate measures are implemented to control dust.
  • Recordkeeping: record of water and/or chemical stabilization applications and note if they are ever suspended, suspension of activities due to high wind events

 

Report Fugitive Dust:

Improve Detroit

[email protected]

(313) 628-9994